Restoration and refurbishment of the roofing and side elevations of the central nave, transept, and drum.

Restoration and repair of the roofing for the dome, central nave, and south transept, which were in a precarious state of preservation, suffering from structural subsidence and water infiltration.

Restoration of the side elevations of the drum (including the lantern) and the central nave.

Lorem ipsum

Lorem ipsum

Lorem ipsum

Lorem ipsum

Description

The restoration work was carried out in two phases.

The first phase, prompted by internal water infiltration, addressed the southern transept and the dome. It involved re-roofing, incorporating a waterproof layer and mechanically anchoring both the outer and under-tiles using appropriate staggered fixing rows, as well as restoring the lantern and the exposed brickwork of the drum.

The second phase focused on the central nave, involving the restoration of exposed brick facades and window fixtures. It also included rehabilitating the tiled roof by re-anchoring both outer and under-tiles with staggered fixing rows attached to the timber framework, replacing pre-formed EPS panels with a new waterproof layer, and installing a lifeline system.

During the restoration, in addition to resolving various roofing issues, the team consolidated the lantern structure using fiberglass wrapping and a lime-based skim coat. They removed the lightning rod (following a technical assessment) which had severed grounding conductors, and stabilized masonry that was in poor condition, showing frequent brick spalling. They also protected the timber structure at the base of the inner dome; this element was exposed on the facade and had suffered advanced deterioration due to a lack of protective covering.

The building lies within the migratory corridor of the Pallid Swift; consequently, specific measures were implemented to allow the birds to nest under the eaves.

2020/2024

Services Provided

Preliminary, detailed and executive design, site supervision and safety coordination.

All works were carried out under the supervision of the Superintendence.

CLIENT

Parish of San Marco, Piazza San Marco, 2 – Milan